FredBuild undertook this job in early 2019. Our backs were up against the wall due to the job starting right in the middle of the wet season and needing to be completed by the end of March in time for the tourist season.
The job consisted of:
An upgrade to the guest accommodation including a new hardwood timber veranda, concrete footpaths and landscaping
Upgrade of the outdoor dining area with new flagstone paving, stone bench seating and installation of the fire pit
Installation of two large timber shade structures, one with stone day beds, and red gravel paths laid through out
Installation of a new 25m guest pool
This was the first job that we undertook at Bullo River Station. The whole project was a success overall which has meant the development of a great relationship with the client, now having moved on to complete stage 2 (Rayner’s Camp) and continue with stages 3 and 4.
What a great place to work.